Bolzaneto junction

Control of wrong-way access to the Bolzaneto station junction. Location: A7 Genova-SerravalleCustomer: Autostrade per l’ItaliaDuration of monitoring service: operational for 38 monthsProject start date: 2016 The “OF Ghost” system was installed with an  aim of detecting any transit of vehicles on the wrong side of the motorway at the junctions in the direction of Genoa… Continue reading Bolzaneto junction

DRILLING WELL IN ABERDEEN

Thermal monitoring of a 1Km deep borehole Location: AberdeenClient: Tullow OilDuration of monitoring service: 8 hoursProject start date: 2017 Installation of the “OF TOWER” System was installed to monitor thermal variations within the concrete casing of a borehole during pressurised water cooling cycles. For this project, distributed sensor technology was used, with a specially produced… Continue reading DRILLING WELL IN ABERDEEN

Tunnel Val di Sambro

Precedente Successivo For the Val di Sambro tunnel, an “OF TUNNEL” system has been studied, designed and installed to monitor the convergence and longitudinal deformations of the tunnel, since it is located in ground subject to landslides.  Location: Apennine stretch between Sasso Marconi and Barberino del MugelloClient: Spea Engineering – Atlantia GroupDuration of the monitoring… Continue reading Tunnel Val di Sambro

“LA RINASCENTE” PALACE

Previous Next Monitoring of the new Rinascente headquarters in Rome, Via del Tritone Client: CMB – Cooperativa Muratori e Braccianti di CarpiDuration of the monitoring service: 38 monthsProject start date: 2017 The “OF BUILDING” system was installed to monitor the deformations, inclinations, vibrations and imbalances of the façade of the new building, and the deformations… Continue reading “LA RINASCENTE” PALACE

TORBELLA BRIDGE – HIGHWAY A/7 GENOA-SERRAVALLE

Previous Next Monitoring of the Torbella viaduct Position: A7 Genova-SerravalleCustomer: Autostrade per l’ItaliaDuration of monitoring service: 12 monthsProject start date: 2016 The “OF Bridge” System was installed to monitor the tensional state, deformations and arrow measurements of the viaduct spans during the ordinary passage of vehicles.One hundred and fifty sensors distributed over the spans of… Continue reading TORBELLA BRIDGE – HIGHWAY A/7 GENOA-SERRAVALLE

ANCIENT ROMAN AQUEDUCT

Previous Next Monitoring a section of the ancient roman aqueduct “Vergine” adjacent to the new “La Rinascente” headquarters in Rome, in Via del Tritone. Customer: Sovrintendenza Capitolina ai Beni Culturali in accordance with CMB – Cooperativa Muratori and Braccianti di Carpi The “OF” System has been installed to monitor the movements of the ancient roman aqueduct “Vergine”… Continue reading ANCIENT ROMAN AQUEDUCT

BUILDINGS SURROUNDING THE “LA RINASCENTE” PALACE

Previous Next RINASCENTE NEW HEADQUARTERS BUILDING AND SURROUNDINGS Monitoring of the new headquarters of La Rinascente in Rome on Via del Tritone and neighbouring buildings. Location: Rome – Via del TritoneClient: CMB – Cooperativa Muratori e Braccianti di CarpiDuration of the monitoring service: 38 monthsProject start date: 2017 Installation of the “OF Building” system was… Continue reading BUILDINGS SURROUNDING THE “LA RINASCENTE” PALACE

NESIMA-MISTERBIANCO TUNNEL

Previous Next Monitoring of the newly built Nesima-Misterbianco tunnel with TBM technology and monitoring of the upgrading and transformation of the railway in the urban areas of Catania and Misterbianco. Location: Nesima-Misterbianco (First Lot)Client: CMC Cooperativa di Muratori e Cementisti di RavennaDuration of monitoring service: 36 months The “OF Tunnel” system was installed to monitor:… Continue reading NESIMA-MISTERBIANCO TUNNEL